Grid Architecture

Grid Architecture lowers construction cost.

Everything in the photo below was built in nine days with just two people and no welding.   

All the following locations were built with Vo-Zone Grid Architecture.

The AutoZone Challenge Center in The Salvation Army Kroc Center.

The CoreFire Commando Rescue Team Aircraft: The CF-1. Built by Vo-Zone Interns.   

Using the grid architecture system allows for the theming components to snap into place, also reducing the construction costs. All the rooms in the photos below, from Vo-Zone Eads, were built and themed by Coach Ty and Vo-Zone Interns for a total cost of supplies of less than $200,000.